Skip to the project story
Case studiesShibusa Systems / 01

San Pedro, California

Planning more housing around what was already there.

How GroundUp helped Shibusa Systems compare housing configurations and deliver revised layouts for an existing San Pedro property.

Follow the project
Project
916 W. Oliver StreetSan Pedro, California
Partner
Shibusa Systems
The work
Feasibility reviewConceptual site planning
Project period
December 2025 – March 2026Predevelopment
From the project recordConceptual site planning
Oliver Street concept layout 1, delivered March 14, 2026. The source drawing labels a 16-foot-wide ADU beside a duplex and existing buildings. Conceptual only; not a permit or construction drawing.

Inside the project

How the work unfolded.

01 / The existing site

The site came first. The layout followed.

The question at Oliver Street was not simply whether another home could fit. It was how to explore additional rental housing around existing buildings while keeping parking, access and day-to-day use in the picture. GroundUp worked with Shibusa to turn that question into alternative configurations, project-specific reports and revised layouts for a live customer conversation.

Shibusa was evaluating an infill opportunity at 916 W. Oliver Street. The project reports described an approximately 8,800-square-foot analyzed site with an existing single-family home and duplex to be retained. The proposed additional housing had to be considered in relation to those structures, rather than designed as though the lot were empty.

The project brief

Start with what is already there

  1. Approximately 8,800 sq ft

    Analyzed site area described in the project reports.

  2. Existing home + duplex

    Buildings to be retained in the proposal.

  3. Parking, access, circulation

    Practical constraints considered alongside additional housing.

Predevelopment analysis · Shibusa Systems × GroundUp

02 / January comparison

Compare configurations, not just floor plans.

GroundUp prepared an initial feasibility report and subsequent revisions. The January analysis compared three configuration families: a single-story Linea duplex, stacked Linea or Linea Extended units, and a two-story two-bedroom/two-bathroom option. The comparison brought building footprint, unit mix, parking and circulation into the same discussion.

Configurations considered

Three January configuration families

  1. Single-story Linea duplex

    A single-story configuration considered in the January report.

  2. Stacked Linea / Linea Extended

    A stacked-unit configuration considered in the same comparison.

  3. Two-story, two-bedroom / two-bathroom

    A further configuration for comparing footprint and unit mix.

Predevelopment analysis · Shibusa Systems × GroundUp

03 / An evolving brief

Respond when the project changes.

The work continued after the first report. In February, Shibusa requested an Ohana Jr. variation and raised questions about the connection between buildings. Updated analysis and site-plan images supported the next client response. By March, the discussion had moved to detached arrangements and a direct comparison of smaller and larger accessory-dwelling footprints.

The project in motion

One project context, successive revisions

  1. February 9

    Updated Oliver Street / Ohana Jr. report delivered.

  2. February 11

    Shibusa confirmed the updated images would support its client response.

  3. March 12

    Working session compared detached 12-foot and 16-foot accessory-dwelling options.

Predevelopment analysis · Shibusa Systems × GroundUp

04 / March 14 delivery

Two revised layouts, delivered.

In the March 12 working session, Shibusa asked to compare 12-foot-wide and 16-foot-wide accessory-dwelling options and review the space between the proposed buildings. On March 14, GroundUp sent two updated site-plan images. The two drawings gave Shibusa a direct visual comparison of the proposed arrangements.

A direct comparison of two arrangements

Layout 1: 16-foot ADU

Oliver Street concept layout 1, delivered March 14, 2026. The source drawing labels a 16-foot-wide ADU beside a duplex and existing buildings. Conceptual only; not a permit or construction drawing.

Layout 2: 12-foot ADU

Oliver Street concept layout 2, delivered March 14, 2026. This version labels a 12-foot-wide ADU. Read alongside layout 1 as an alternative, not a built outcome.

What changed

A clearer set of decisions for the client.

Shibusa had project-specific material to use in a continuing customer discussion: written alternatives, revised building arrangements and visual comparisons tied to the existing site. In a February response, Shibusa Systems confirmed that the updated images would give the team what it needed to respond to the client. That gave Shibusa a concrete basis for continuing the conversation as the customer’s requirements changed.

The useful output was more than a drawing. It was a way to connect the customer’s housing objective, Shibusa’s building configurations and the site’s practical constraints. As the brief evolved, GroundUp and Shibusa could work from the same project context instead of discussing an isolated floor plan. That is the role illustrated here: helping a housing provider move from an inquiry toward a more specific project decision.

Pre-development analysis and conceptual design. These historical concepts are not surveyed, stamped, permit-approved or as-built plans. The records do not establish a signed customer agreement, financing approval, permit issuance or construction outcome.

Published · GroundUp

Another site. Another question.

From housing models to a site-specific proposal.

Hilo, Hawaii · Shibusa Systems

Bring your next project

A site. A housing idea.
A clearer next step.

Have a site or customer inquiry to evaluate? Start a conversation with GroundUp.