How to run a sharper feasibility screen before you tie up a site
A practical sequence for screening parcels by zoning, physical fit, utilities, and entitlement risk before the diligence clock starts.
GroundUp Team
Start with the question the parcel needs to answer
The first pass should not try to prove the full deal. It should decide whether the site is worth deeper diligence. Start with the intended product, target yield, likely approval path, and the few constraints that would immediately change the acquisition thesis.
Translate zoning into a development envelope
Base zoning, overlays, setbacks, height, parking, lot coverage, and density limits need to become a quick envelope. The useful output is not a copied code section. It is a plain-language answer to what could fit by right, what requires interpretation, and what would need discretionary review.
Check physical fit before polishing assumptions
Use parcel geometry, frontage, slope, access, wetlands, flood risk, easements, and utility context to test whether the program has room to work. A project can pass zoning and still fail because the site cannot absorb circulation, stormwater, fire access, or workable building pads.
Decide what evidence would change your mind
End the screen with a short list of open items and the decision each item controls. This makes the next diligence step faster because the team knows which facts are merely interesting and which facts change price, timeline, yield, or go/no-go.